Henan Aifite Intelligent Equipment Co., LTD.
Products
Chain Hook for Lifting Concrete Track Sleepers
Classification:
Product Introduction
In railway construction and track laying, the lifting of concrete sleepers (typically weighing 300-1000 kg each) has long faced three major pain points: low efficiency, vulnerable parts, and high safety risks. Traditional wire rope direct binding not only easily leads to cracking of the sleeper edges, but also results in unstable lifting and low efficiency. The advent of the simple chain hook lifting beam provides a safe, efficient, and convenient solution for sleeper lifting.

Scenarios Covered: From Prefabrication Site to Construction Site
1. Sleeper Prefabrication Site: Finished Product Transfer
After concrete sleepers are demolded, they are lifted from their pedestals to the stacking area using a lifting beam, preventing side collisions caused by forklift handling. Using this system at one prefabrication site, stacking efficiency increased by 40%, and sleeper corner integrity reached 100%.
2. Track Laying Site: Precise Positioning
Using crawler cranes or truck cranes, sleepers are lifted onto the roadbed or bridge. The lifting beam's horizontal adjustment function (fine-tuning the height difference between the hooks at each end) ensures precise alignment between the sleeper and the fastening system, with a single sleeper placement time of 2 minutes or less.
3. Old Sleeper Replacement: Lightweight Operation
During urban rail transit maintenance, simple lifting beams can be used in conjunction with pickup cranes (3.2-ton capacity) to remove old sleepers. Compared to large cranes, simple lifting beams offer greater flexibility and are particularly suitable for confined spaces such as tunnels and tight curves.
Keyword:
Feedback
Leave a message online and get the product quotation free of charge. We will arrange the specialist to contact you as soon as possible.