Henan Aifite Intelligent Equipment Co., LTD.
Products
Modular Lifting Beams: the "air building block" of Prefabricated Buildings, Reconstructing a New Paradigm for Lifting Efficiency
Classification:
Product Introduction
At a prefabricated building construction site, a modular crane beam steadily lifts dozens of tons of prefabricated building modules, slowly moving them toward their designated locations. On the ground, workers simply tap a control panel to precisely position these "steel building blocks"—a vivid example of how modular crane beams are reshaping the industrialization of construction.

Modular Design: The Flexible Code for "Building Block-style" Lifting
The core breakthrough of the modular lifting beam lies in its "interlocking lifting framework." It consists of multiple standardized beam sections, lifting point assemblies, and connecting devices, allowing for flexible assembly like building blocks:
Adaptable Length: From 6 to 30 meters, it can be flexibly assembled to suit the size of the prefabricated component (for example, the building module being hoisted in the image is 12 meters long, and the beam is assembled from three 4-meter beam sections).
Customizable Load Capacity: A single beam section can handle loads from 5 to 50 tons. By adding or removing beam sections or adjusting the number of lifting points, it can meet lifting requirements ranging from small wall panels to entire floor modules.
Lightweight Transportation: After disassembly, a single beam section weighs ≤ 3 tons and can be transported by ordinary trucks, resolving the challenges of traditional large-tonnage lifting beams, which are difficult to transport and bring to site.
This design allows a single modular lifting beam to accommodate over 80% of prefabricated component lifting scenarios, eliminating the wasteful use of "one piece of equipment per project."
Unlimited Applications: Beyond Construction, Empowering Heavy-Duty Transportation Across Industries
The modular design of the modular lifting beam extends beyond the construction industry, transforming it into a powerful heavy-duty transportation tool across a wide range of industries:
Wind Turbine Operations and Maintenance: 25-meter-long lifting beams can be assembled to lift 80-ton wind turbine nacelles, addressing the challenges of difficult transportation and installation in mountainous wind farms.
Bridge Construction: A "shoulder-pole" lifting beam can be combined to simultaneously lift two prefabricated T-beams with an accuracy of ±5 mm, improving bridge assembly efficiency.
Equipment Relocation: After disassembly, the beam can be brought into the workshop to lift a 10-ton machine tool bed, maneuvering flexibly through narrow aisles, replacing the traditional "disassembly and manual handling" method.
Keyword:
Feedback
Leave a message online and get the product quotation free of charge. We will arrange the specialist to contact you as soon as possible.